Investigate route and pipe
Material, size, depth, length, bends, fittings, grade, utilities, and connections are documented.
Pipe bursting replaces an existing buried pipe by fracturing or displacing it while pulling a new pipe through the same general path. Candidacy depends on pipe material, diameter, route, depth, utilities, fittings, access pits, surrounding soil, connections, and whether the existing alignment and grade should be retained.
Material, size, depth, length, bends, fittings, grade, utilities, and connections are documented.
Launch and receiving pits, pulling direction, machine location, spoil, and restoration are planned.
Head size, pulling equipment, pipe material, joints, and diameter are matched to the project.
The new pipe is pulled, endpoints and branches are connected, and grade, flow, or camera condition is checked.
Bursting displaces soil and fragments outward, so nearby utilities must be considered carefully.
Pipe bursting does not correct a poor route or belly unless additional excavation changes alignment.
Surface restoration and equipment access should be clearly scoped.
Ductile, reinforced, heavily repaired, or unusual pipes may require another method.
Sometimes upsizing is possible, but soil displacement, utilities, depth, equipment, and local requirements limit it.
The host pipe is fractured or displaced around the new pipe rather than removed along the full route.
At least launch and receiving access are typical, with additional excavations possible for connections, bends, or site constraints.
Not by following the same sagging route; correcting grade generally requires excavation or route modification.