Confirm route and scope
Camera findings, locating, depth, length, utilities, access, connections, and restoration limits are reviewed.
Open-trench sewer replacement exposes the failed line so damaged piping can be removed and new pipe installed with controlled grade, bedding, connections, and inspection access. It is often selected when the route is accessible, the line has severe collapse or offset, grade must be corrected, or trenchless methods are not suitable.
Camera findings, locating, depth, length, utilities, access, connections, and restoration limits are reviewed.
The route is opened with appropriate equipment, protection, spoil handling, and access planning.
Failed pipe is removed or abandoned as planned, and new piping, fittings, cleanouts, bedding, and connections are installed.
The work is checked before backfill, then compacted and restored according to the agreed scope.
Concrete, asphalt, landscaping, irrigation, fencing, and finish grading should be clearly included or excluded.
Public utility locates do not identify every private line, irrigation system, or abandoned service.
Depth, soil, groundwater, unrecorded connections, and adjacent defects can affect the project.
Bedding, alignment, support, and compaction are essential to long-term drainage.
It is often preferable when grade must be corrected, the pipe is collapsed, connections must be exposed, or the route is already accessible.
Only the planned route and access areas, but trench width, equipment travel, spoil, and safety clearance require additional working space.
Methods vary by jurisdiction and scope and may include visual inspection, grade checks, water or air testing, and post-installation camera inspection.
Only if specifically included in the written scope; restoration limits should be confirmed before work begins.